Maldives
ADDENDUM 2
Addendum to Announcement no: WAMCO-PRO/IUL/2022/129
Issued Date |
03 January 2023 |
Project |
SUPPLY, DELIVERY AND INSTALLATION OF HCI SOLUTION FOR WASTE MANAGEMENT CORPORATION LIMITED |
Please include this amendment when submitting the bid.
Following Changes are brought to the Information Sheet.
|
1.1.Minimum Technical Specifications |
|
1.2. Installation, Configuration, Migration and Training |
|
|
1.1.Sealing the Bid Note: All pages of the proposal must be stamped, signed and comb bound together. Proposals not following these guidelines can be subjected to rejection. Proposals with loose pages will also be rejected. The bid document should be sealed properly in an envelope. and should mention the name of the company and the bid reference number. SUPPLY, DELIVERY AND INSTALLATION OF HCI SOLUTION FOR WASTE MANAGEMENT CORPORATION LIMITED WAMCO-PRO/IUL/2022/129 WASTE MANAGEMENT CORPORATION LIMITED MALE’ WASTE TRANSFER STATION, INDUSTRIAL VILLAGE, BODUTHAKURUFAANU MAGU MALE’ MALDIVES 3025804, 3000584 DATE & TIME: 10th January 2023, 11:00 AM PROPOSAL SUBMITTED BY:
|
1.2.Bid Submission. Waste Management Corporation Limited (WAMCO) Male’ Waste Transfer Station, Industrial Village Boduthakurufaanu Magu Male’ Maldives Date & Time: 10th January 2023, 11:00 AM |
FORM 4 - Technical Compliance FORM
Minimum Technical Specification
27. The vendor shall supply and install minimum 1x Network Manageable 6000VA UPS with extendable battery pack (Vendors are allowed to quote for UPS from a third party with a genuine authorized distributor certificate).
Installation, Configuration, Migration and Training
|
FORM 4 – TECHNICAL COMPLIANCE FORM
# |
Minimum Technical Specifications |
Can Provide Service/Item as per Specs (Yes/No) |
If NO, please mention the specification provided |
1 |
HCI solution based on hyper-converged software to deliver enterprise-class storage services using server infrastructure and without dependence on SAN Switches & HBAs. |
|
|
2 |
The proposed HCI solution must include the latest VMware vSphere 7.x hypervisor license and VMware vCenter License |
|
|
3 |
The proposed HCI solution should be 100% software defined without dependency on any proprietary hardware component |
|
|
4 |
The proposed HCI solution should be appliance models and not custom configured |
|
|
5 |
The proposed HCI solution must have minimum 2 nodes and a minimum of 8 drives per node |
|
|
6 |
Each node must be proposed with a minimum 24 core Intel or AMD processor or higher. |
|
|
7 |
The node must support 2 Intel or AMD processors. If the HCI software license is based on the number of processors or cores, then the bidder must propose license for 2 processors or 48 cores per node. |
|
|
8 |
If the HCI software license is based on storage capacity or drives, then the bidder must propose the license for the maximum possible storage capacity or drives in the proposed node model. |
|
|
9 |
Each node must be proposed with 256 GB minimum 3200 Mhz memory. Each node must have 32 DIMM slots in total |
|
|
10 |
The proposed solution must provide a minimum of 15 TB of usable storage capacity. This capacity must be provided without including capacity benefits achieved using deduplication and compression. The capacity tier shall be based on enterprise class 10K RPM SAS SFF HDD or Mixed-Use SSD only. |
|
|
11 |
The proposed HCI solution must include inline deduplication and inline compression and these features must be turned on during the implementation. Necessary licenses for using these features must be included and proposed by the bidder. Any additional CPU and memory overheads created by deduplication and compression must be factored in by the bidder. |
|
|
12 |
The proposed HCI solution must sustain one node failure and necessary provision for witness/tie-breaker must be proposed by the bidder. |
|
|
13 |
The proposed solution should not have any single point of failure |
|
|
14 |
Each node must have dedicated cache drive, boot drive and housekeeping drive |
|
|
15 |
Each server node must have dedicated redundant hot swap power supplies & cooling fans. |
|
|
16 |
Each node must have 10 Gbps or higher speed network ports in a redundant configuration. Each node shall be supplied with minimum 02 nos x PCIe Dual Port 10 GbE NIC |
|
|
17 |
All necessary cables and transceivers must be included in the proposal. |
|
|
18 |
The solution shall utilize the existing Dell N4032 for core networking. |
|
|
19 |
The solution must support one-click non-disruptive rolling upgrades of HCI software and system firmware. |
|
|
20 |
The solution must have automated call home and ticketing capability in the event of critical alerts/failures |
|
|
21 |
The solution should have a plugin in the Hypervisor for HCI management. Administrators should be able to view, provision, manage and monitor HCI solution from the hypervisor's management console. |
|
|
22 |
The HCI filesystem should be a scale-out distributed filesystem where the data is striped across multiple nodes where the read and write can happen across all the nodes for any given virtual machine. |
|
|
23 |
The HCI software must support native instant, space-optimized, point-in-time snapshots. The GUI must have the capability to schedule snapshots based on various times. If the HCI software does not support native snapshots, then the bidder must include 3rd party storage- level snapshot license for a minimum of 50 VMs. Hypervisor-level snapshots must be excluded to avoid any overheads on the guest VMs. |
|
|
24 |
The HCI software must support native rapid clones of individual Virtual Machines. If the HCI software does not support native clones, then the bidder must include 3rd party storage-level clone license for a minimum of 50 VMs. Hypervisor-level clones must be excluded to avoid any overheads on the guest VMs. |
|
|
25 |
The HCI software must support asynchronous native replication between 2 sites at the storage level. Necessary licenses must be included in the proposal. If the HCI software does not support native replication, then the bidder must include 3rd party storage-level replication license for a minimum of 50 VMs. Hypervisor-level replication must be excluded to avoid any overheads and performance issues on the guest VMs. |
|
|
26 |
The solution must automatically rebalance data to maintain balanced utilization of storage across the HCI nodes when storage capacity is scaled up or scaled out. The HCI nodes must automatically redistribute data equally across all nodes without migrating VMs. |
|
|
27 |
The vendor shall supply and install minimum 1x Network Manageable 6000VA UPS with extendable battery pack (Vendors are allowed to quote for UPS from a third party with a genuine authorized distributor certificate). |
|
|
28 |
The proposed hardware shall include 3-Year manufacturer warranty and 3-Year local technical support |
|
|
29 |
The proposed solution should include management features such as: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Installation, Configuration, Migration and Training |
|||
|
All professional services shall be delivered by manufacturer certified engineers only. |
|
|
|
The engineer(s) shall be available onsite for the duration of the service. |
|
|
3. |
The engineer(s) shall be available for technical support, 3 months post deployment either remote or onsite. |
|
|
|
The proposed professional services delivery team engineer(s) shall be certified in Cisco, Vmware and the HCI proposed in the solution |
|
|
|
The vendor MUST have at minimum the following full time OEM Certified Professional/Engineer under its payroll to provide all professional services. All relevant engineer(s) certificates and supporting documents shall be included with the proposal. Required certificates of the engineer(s):
|
|
|
|
Perform site readiness assessment ensuring environment is ready for project commencement |
|
|
|
Shall provide planning, deployment and user acceptance test details |
|
|
|
Rack mounting as per manufacturer recommendation(s). |
|
|
|
Check and ensure all installation pre-requisites are met |
|
|
|
Powerup, network and management cabling as per manufacturer guidelines |
|
|
|
Configure service segmentation on existing core network switches |
|
|
|
Configure and upgrade VMware vcenter server |
|
|
|
Initialize all nodes as per manufacturer best practice and upgrade to latest stable firmware |
|
|
|
Install any required licenses or options |
|
|
|
Migrate all existing workloads to the new infrastructure (up to 30 VMs) |
|
|
|
Role based access control for different administrators |
|
|
|
Configure VMware vcenter plugin for HCI management |
|
|
|
Configure centralized remote management |
|
|
|
OEM Certified Training on the proposed HCI for 03 Technical Engineer
|
|
|
|
Install and configure UPS |
|
|
|
On the job training for up to 03 technical person on management and administration of the system |
|
|
|
Detailed documentation on the configuration and settings of the delivered system shall be provided |
|
|
Should you require any further clarification/information, please call the below number or inquire in writing to the below mentioned email address.
Information sheet regarding this proposal will be available on Waste Management Corporation Limited’s website.
Waste Management Corporation Limited (WAMCO)
Male’ Waste Transfer Station
Boduthakurufaanu Magu
Male’, Republic of Maldives
Tel: +9603025804, Fax: +9603000584
Website: www.wamco.com.mv
Email: [email protected]